Description
Product Introduction
Project name:Steel Structure Building For Warehouse
Project address:Israel
Area:610 square meters
Completion time:the year of 2020
Application:Car testing center
This project adopts circle-castellated steel beams and square tube trusses,all structures were treated with hot-dip galvanized.
Product Information
(Steel tube truss system)we adopt hot-dip galvanizing C section or steel tube truss beam to reduce self-weight of design load and dosage of the steel. At the same time, hot-dip galvanized can widely improve anti-corrosion of the steel. (The construction cycle of the steel structure work is short, which reduces the cost of the project effectively. The steel structure has strong shock resistance and can improve the comprehensive anti-seismic property of the whole house).
The Advantage Of Prefabricated Steel Structure Buildings:
1. The construction speed is fast and the construction period is short.
2. The weight of material is light and the strength is high.
3. The performance on safety and seismic is good.
4. The flexible structure can meet the needs of multiple functions.
5. The steel structure materials can improve the use area of the warehouse building.
6. The steel structure has long service life, usually more than 50 years.
7. The materials are green, recyclable and environmental protection.
8. Sandwich panel as wall and roof panel is good at heat and voice insulation.
Frequently Asked Questions about steel structure for sale
Q: 1.What is the package and loading method?
A: For the steel structure members, we propose to use the steel pallet to minimize the number of containers and easy to load and unload. For other material, they would be nude cargo.
Q: 2.How should your company guarantee the quality?
A: We are ISO9001 and CE certified plants and we have strict quality system system to make sure each step of fabrication is up to related standard.
Q: 3.How many days for fabricating a steel structure building project?
A: Usually 30-40 days.
Q: 4.How long it will need to erect a building?
A: It depends on the size of the building, complexity of the structure, number of workers and competence of the worker and other factors.
Q:1.How do you ship the products?
A: Usually used the steel pallet and deliver by shipping container.