Prefabricated Steel Structure Pharmaceutical Factory

Prefabricated Steel Structure Pharmaceutical Factory

Compared to other genaral steel structure workshop, the cladding of steel structure Pharmaceutical factory need more strict required. it must be fire proofing and cleaning. for this case, then our engineer design with 75mm PU sandwich panel for the roof and wall. due to the limitation of natural lighting and ventilation, the total width of the workshop should not exceed 24m for this steel structure pharmaceutical workshop.

Send Enquiry

Description

Product Introduction

Compared to other genaral steel structure workshop, the cladding of steel structure Pharmaceutical factory need more strict required. it must be fire proofing and cleaning. for this case, then our engineer design with 75mm PU sandwich panel for the roof and wall. due to the limitation of natural lighting and ventilation, the total width of the workshop should not exceed 24m for this steel structure pharmaceutical workshop.

Ceiling: good insulation 50mm PU sandwich panel

Partition: good insulation 50mm PU sandwich panel

Wall panel: good insulation 75mm PU sandwich panel

The structural columns of factory buildings are welded H-shaped steel columns, and the roof truss beams are welded H-shaped steel variable cross-section beams. S-shaped cold-formed thin-walled steel purlins are arranged on the roof truss beams. Steel column and foundation are anchored with foot bolts. The floor of steel column in workshop is 150 mm lower than that of indoor floor.

All the installation and connection of steel structures adopt bolt connection mode, among which high strength bolts are used for column-beam connection, beam connection and splicing. Others, such as purlin connection, wind column and roof truss beam connection, use ordinary bolts for corner connection. Horizontal support of roof truss beam is connected by round steel with flower basket bolts, and self-tapping bolts or self-drilling bolts are used to connect maintenance plate and support of maintenance plate.

Product Information




 

Frequently Asked Questions about steel structure for sale

Q:1.What is the advantages of steel building?Or why should we choose steel building as solution to property development?

A: Compared with the traditional R.C.C(reinforced concrete) building, steel structure building is 30% cost-saving,60% less construction time required,40% less weight and nearly 80% resell value while meeting up the customer’s construction request at the same time.

Q: 2.What is the application of steel building?

A: Steel structure building construction could be applied in industrial, commercial, residential and agricultural sectors like production workshop, logistics warehouse, supermarket, shopping mall, office building and farming house facility etc.

Q: 3.What is the component of a typical steel building?

A: Pe-engineered steel buildings are a steel structures built over a structural concept of primary members, secondary members, roof and wall sheeting connected to each other and various other building components. These buildings can be provided with different structural and non-structural additions such as skylights, wall lights, turbo vents, ridge ventilators, louvers, roof monitors, doors & windows, trusses, mezzanine floors, fascias, canopies, crane systems, insulation etc., based on the customer’s requirements. All the steel buildings are custom designed to be lighter in weight and high in strength.

Q: 4.How many days for fabricating a steel structure building project?

A: Usually 30-40 days.

Q: 5.What should I provide for a quotation if I’m new to the steel structure?

A: Please provide the length, width and height for the building. The application of your building and your local wind speed, snow load etc. Other requirements and preliminary drawings would be appreciated.

Q: 6.How should your company guarantee the quality?

A: We are ISO9001 and CE certified plants and we have strict quality system system to make sure each step of fabrication is up to related standard.

Q: 7.What is the package and loading method?

A: For the steel structure members, we propose to use the steel pallet to minimize the number of containers and easy to load and unload. For other material, they would be nude cargo.

Q: 8.What is payment term?

A: T/T or LC. Both acceptable.

Q: 9.Would you provide the erection drawing for my building project?

A: Yes, we will provide the installation drawing for your assembly of the building.

Q: 10.How long it will need to erect a building?

A: It depends on the size of the building, complexity of the structure, number of workers and competence of the worker and other factors.

Reviews

There are no reviews yet.

Be the first to review “Prefabricated Steel Structure Pharmaceutical Factory”

Your email address will not be published. Required fields are marked *

error: Content is protected !!