Description
Product Introduction
Steel Structure Industrial Building Plant for Gold Mining
The total steel structure industrial building project cost is $5.38 million USD,the steel is about 2600ton,the whole contract period of 150 days,80 days,on-site installation and construction of 80 days.It is used as gold mining plant.
Steel column:latticed column,with the height of the latticed column up to 39 meters,fixing the column foot adopts shape of rim of a cup foundation,with buried depth of 2.2 meters,and single steel column weighing about 28 tons,a total of 22
Steel beam: tube truss steel structure,span 33 meters,12 meters bay,33m main span on each side of 17.445 and 14.26m auxiliary span, auxiliary span for two or three layer structure,
Five storeys platform in the main span.And among messy distribution of platform steel column are criss-cross with civil foundation.
Product Information
Frequently Asked Questions about steel structure for sale
Q:1.Do you offer guiding installation on site overseas?
A: Yes, we can provide the service of installation, supervision and training by extra. We can send our professional technical engineers to supervise installation on site overseas. Besides, we also have our own abroad guiding installation team consisting of more than 30 people. They have finished many cases successfully in many countries, such as Iraq, Dubai, South Africa, Algeria, Ghana, Gabon, Tajikistan, Burkina Faso, Panama, Australia and so on.
Q:2.Am getting into poultry farming and want housing equipment that I can just install. Do you sell that?
A: Yes, our company can provide the poultry house building and equipment according to your requirement. you can tell us more details about the poultry house.
Q: 3.What should I provide for a quotation if I’m new to the steel structure?
A: Please provide the length, width and height for the building. The application of your building and your local wind speed, snow load etc. Other requirements and preliminary drawings would be appreciated.
Q:4.How do you ship the products?
A: Usually used the steel pallet and deliver by shipping container.
Q:5.Would you provide the erection drawing for my building project?
A: Yes, we will provide the installation drawing for your assembly of the building.
Reviews
There are no reviews yet.